ASEA METAL — Quality Assurance Manual

Scope: Stainless steel tubes & pipes (Heat Exchanger Tubes, Instrumentation Tubing, U-bend Tubes, Finned Tubes) and related inspection / documentation.
Company: ASEA METAL CO., LTD.
Revision: 2026-04 (Website edition)

1) Quality Policy

ASEA METAL is committed to delivering stainless steel tubing and piping that meet customer specifications and applicable standards through controlled manufacturing, verified inspection, and complete documentation. Our core principles are traceability, consistency, and on-time delivery.

2) Applicable Standards (Typical)

The exact standard and inspection scope are defined by the purchase order / project ITP. Common references include (but are not limited to):

3) Definitions (Key Terms)

4) Material Control & Traceability

5) Manufacturing Control (Overview)

Process steps vary by product type. ASEA METAL controls critical parameters and verifies outputs at defined checkpoints.

Process Control Point Typical Record
Cold drawing / sizing OD / WT control, surface condition In-process dimensional sheet
Heat treatment (if applicable) Time / temperature, furnace chart Heat-treatment record
Straightening / cutting Length, end condition, squareness Cut length report
Cleaning / preservation Cleanliness, caps, moisture control Cleaning / packing checklist

6) Inspection & Testing (Typical Menu)

Inspection items are selected by standard and customer specification. ASEA METAL provides records and certificates as required.

Item Method (Example) Acceptance (Example) Record
Visual Surface check, dents, scratches No harmful defects per spec Visual inspection sheet
Dimensional OD / WT / length / straightness Per ASTM/PO tolerance Dimensional report
PMI (optional) XRF or OES Grade confirmation PMI log
Eddy Current (ET/ECT) NDT per applicable standard Per standard criteria ET record
Hydro / Pneumatic (optional) Pressure test per PO/ITP No leakage Test certificate

7) Measuring Equipment & Calibration

8) Nonconformance & Corrective Action (CAPA)

9) Packaging, Preservation & Shipping

10) Document Control & Record Retention

11) Responsibilities (RACI Overview)

Role assignments may vary by project. The following overview clarifies practical responsibility across sales, production, and QA/QC.

Activity Sales Production QA/QC Mgmt
Contract review / requirements confirmation R C C A
Incoming material verification I R A I
Nonconformance disposition I R A C
Final release / shipment documentation C R A I

12) ITP (Inspection & Test Plan) — Template

Use this template for customer projects. Add/Remove items per PO/spec and indicate Hold/Witness points.

Stage Inspection / Test Method Acceptance Record
Incoming MTC check / Heat No. verification PO / EN 10204 Match grade Incoming log
In-process OD / WT / length check ASTM tolerance Within tol. Dim report
NDT Eddy Current (ET/ECT) Applicable ASTM Per criteria ET record
Final Visual / marking / packing Work instruction OK Final checklist

13) Appendix — Blank Checklists

Checklist Item Result / Remark
OD/WT/Length verified□ OK □ NG
End caps installed□ OK □ NG
Marking matches heat/grade/size□ OK □ NG
Packing condition damage-free□ OK □ NG

For inquiries, please contact ASEA METAL CO., LTD. at [email protected].