ASEA METAL QA Manual cover

Table of Contents

ASEA METAL CO., LTD. — QA Manual (Stainless Steel Tubes)
  1. Quality Policy
  2. Applicable Standards
  3. Definitions
  4. Material Control & Traceability
  5. Manufacturing Control
  6. Inspection & Testing
  7. Measuring Equipment & Calibration
  8. Nonconformance & CAPA
  9. Packaging, Preservation & Shipping
  10. Document Control & Record Retention
  11. Responsibilities (RACI)
  12. Inspection & Test Plan (ITP) Template
  13. Forms & Checklists (Appendix)
  14. Revision History

ASEA METAL — Quality Assurance Manual

Scope: Stainless steel tubes & pipes (Heat Exchanger Tubes, Instrumentation Tubing, U-bend Tubes, Finned Tubes) and related inspection / documentation.
Company: ASEA METAL CO., LTD.
Revision: 2026-04 (Website edition)

1) Quality Policy

ASEA METAL is committed to delivering stainless steel tubing and piping that meet customer specifications and applicable standards through controlled manufacturing, verified inspection, and complete documentation. Our core principles are traceability, consistency, and on-time delivery.

2) Applicable Standards (Typical)

The exact standard and inspection scope are defined by the purchase order / project ITP. Common references include (but are not limited to):

3) Definitions (Key Terms)

4) Material Control & Traceability

5) Manufacturing Control (Overview)

Process steps vary by product type. ASEA METAL controls critical parameters and verifies outputs at defined checkpoints.

Process Control Point Typical Record
Cold drawing / sizing OD / WT control, surface condition In-process dimensional sheet
Heat treatment (if applicable) Time / temperature, furnace chart Heat-treatment record
Straightening / cutting Length, end condition, squareness Cut length report
Cleaning / preservation Cleanliness, caps, moisture control Cleaning / packing checklist

6) Inspection & Testing (Typical Menu)

Inspection items are selected by standard and customer specification. ASEA METAL provides records and certificates as required.

Item Method (Example) Acceptance (Example) Record
Visual Surface check, dents, scratches No harmful defects per spec Visual inspection sheet
Dimensional OD / WT / length / straightness Per ASTM/PO tolerance Dimensional report
PMI (optional) XRF or OES Grade confirmation PMI log
Eddy Current (ET/ECT) NDT per applicable standard Per standard criteria ET record
Hydro / Pneumatic (optional) Pressure test per PO/ITP No leakage Test certificate

7) Measuring Equipment & Calibration

8) Nonconformance & Corrective Action (CAPA)

9) Packaging, Preservation & Shipping

10) Document Control & Record Retention

11) Responsibilities (RACI Overview)

The table below is a practical role map. Actual titles may vary by project and factory; responsibilities remain consistent.

Activity Sales Production QA/QC Management
Contract review / RFQ confirmationRCCA
Supplier / raw material approvalCRAC
In-process inspectionIRAI
NDT planning & executionICA/RI
Release, packing & shipment docsCRAI
Nonconformance dispositionIRAC

12) Inspection & Test Plan (ITP) — Template

Use this template for customer projects. Add/Remove items per PO/spec and indicate Hold/Witness points.

Stage Inspection / Test Standard / Method Acceptance Record
IncomingMTC check / Heat No. verificationPO / EN 10204Match required gradeIncoming log
In-processOD/WT measurementASTM toleranceWithin toleranceDimensional sheet
NDTEddy Current (ET/ECT)Applicable ASTMPer criteriaET report
PressureHydro / Pneumatic (if required)PO / ITPNo leakageTest cert
FinalVisual + marking checkWork instructionCorrect markingFinal checklist
PackingCaps / moisture / cratePacking specDamage-freePacking list

13) Forms & Checklists (Appendix)

The following blank forms can be used for internal control or provided to customers upon request.

A) Incoming Material Verification Checklist

PO / Project
Supplier / Mill
Grade / Standard
Heat No. / Lot
MTC received□ Yes □ No
PMI required□ Yes □ No
Result / Remarks

B) Final Inspection & Packing Checklist

ItemOK / NG / Remark
OD / WT / Length verified
Visual condition acceptable
Marking / labels correct (Heat No., grade, size)
End caps installed
Packaging type per PO (bundle / case)
Documents attached (MTC, reports, packing list)

14) Revision History

Revision Date Description
2026-042026-04-07Initial website edition for QA Manual posting (ASEA METAL).

Appendix Pack (Extended)

The following pages are practical templates and check sheets used for stainless tube production, inspection, packing, and document packages.
Note: Fill-in areas are intentionally large to support printing and handwriting.

15) Incoming Material Log (Blank)

Date Supplier Heat No. Grade Size Qty Remark

16) In-Process Dimensional Check Sheet (Blank)

Use for OD/WT/Length sampling during sizing/cutting/finishing.
Heat / Lot Size Spec Tol. Machine/Line Inspector / Date
No. OD (mm) WT (mm) Length (mm) Ovality Remark
1
2
3
4
5
6
7
8
9
10

17) U-Bend Tube Process Checklist (Blank)

Recommended checkpoints: bending radius, springback, wrinkle, ovality, end squareness, and marking preservation.
Project/PO Heat/Lot Size Bend Radius Operator / Date
Check Item OK NG Remark
Visual after bending (wrinkle / dent / scratch)
Ovality at bend
Leg length / center distance
End condition / squareness
Marking / traceability maintained
Cleaning / caps installed
Final packing condition

18) NDT Record Sheet (ET/ECT/UT) (Blank)

Method Procedure/Std. Sensitivity / Setting Operator / Date
Tube No. Indication Disposition Retest Remark
1
2
3
4
5
6
7
8
9
10

19) Nonconformance Report (NCR) (Blank)

NCR No.
Date
PO / Project
Heat / Lot
Description of nonconformance
Immediate action / segregation
Disposition (□ Rework □ Use-as-is □ Scrap □ Return)
Root cause / corrective action

20) Final Documentation Package Checklist (Blank)

Typical pack: MTC, dimensional report, NDT reports, pressure test certificate (if required), packing list, photos (if required), EN 10204 3.1/3.2 (if required).
Document / RecordIncludedRemark
MTC / MTR (chemical + mechanical)□
Dimensional inspection report□
Eddy Current / UT report□
Pressure test certificate (if required)□
Final inspection checklist□
Packing list / marking list□
Customer / TPI witness records (if any)□
Other□

21) Calibration Status Log (Blank)

Track measuring equipment: micrometers, vernier calipers, thickness gauges, etc.
Equipment ID Description Range Last Cal. Due Status/Remark

22) Visual Inspection Report (Blank)

PO / Project
Heat / Lot
Size
Quantity
Acceptance criteria (summary)
Findings / Remarks
Inspector
QA Approval

23) Packing Standard Checklist (Blank)

Use for bundle/case packing verification before shipment.
Item OK NG Remark
End caps installed on all tubes
Tube surface protected (wrapping / separators)
Moisture control applied (desiccant / VCI if required)
Correct labels and marking list attached
Wooden case integrity (if applicable)
Strapping and corner protection
Photos taken (if required)
Final count and packing list verified

24) Heat Treatment Record (Blank)

Furnace ID Charge No. Grade Temp/Time Operator / Date
Notes / Deviations

25) CAPA (Corrective & Preventive Action) Form (Blank)

CAPA No.
Related NCR No.
Problem statement
Root cause analysis (5-Why / Fishbone)
Corrective action plan
Preventive action / recurrence prevention
Owner / Due date
Effectiveness check

26) Training Record (Blank)

Employee Topic Date Trainer Result / Signature

27) Internal Audit Checklist (Blank)

Audit ItemOKNGRemark
Document control / revision availability
Traceability: heat/lot marking maintained
Calibration status within validity
NCR/CAPA process applied and closed
Packing and preservation per spec
Records complete and retrievable
Customer requirements (ITP) implemented
Training records current for operators/inspectors

28) Supplier Evaluation Record (Blank)

Use for mills, processors, NDT subcontractors, and packing suppliers.
Supplier Scope On-time Quality Docs Remark

For inquiries, please contact ASEA METAL CO., LTD. at [email protected].